27th December 2022: Visit of H.E. Ambassador of India to Nepal to project sites
In a significant visit, the Ambassador of India to Nepal, His Excellency Mr. Naveen Srivastava, visited the Kathmandu sites of Seto Macchindranath Temple and Nepal Bhasa Parishad to observe and assess the ongoing conservation and retrofitting works being funded by the Government …
Brick soling and lime concrete foundation wall of the plinth
Work on foundation started on 27th March as per CLPIU approved proposal which is based on inputs given by Nepalese structural experts representing community/CLPIU. …
Work on foundation started
Work on foundation started on 27th March as per CLPIU approved proposal which is based on inputs given by Nepalese structural experts representing community/CLPIU. …
Assessment of the Pinnacle
Assessment of the Pinnacle of the temple (gajur) and structural members beneath it by INTACH structural expert on 16th March by CLPIU, contractor carpenter and metal worker. …
Repair of Nago Khwa (metal figurehead) on tiered roof
Repair of Nago Khwa (metal figurehead) on tiered roof. …
Preliminary assessment of the pinnacle of the temple and its underside
Preliminary assessment of the pinnacle of the temple and its underside. …
Inventory of Bhairaba heads and sample repair of metal Bhairaba face
Inventory of Bhairaba heads and sample repair of metal Bhairaba face. …
Covering of chaityas in the courtyard
Scaffolding on the second floor completed. Covering of the chaityas in the courtyard. …
Rat holes and foundation soil stabilized with lime slurry
Rat holes and foundation soil stabilized with lime slurry. …