Structural Investigations

October 2021

Pit B was carefully dug till 1.5m at the Garva Griha wall. Work at Pit B stopped due to sand filling up the pit continuously from the sides. INTACH, CLPIU to discuss interventions to be taken for strengthening of foundation based on INTACH expert advice.